Office set – Germany

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2020

We started the assembly of the office set, which is solved by 6 pieces of modules with a floor plan of modules in the dimensions of 10x3m and 6x3m.

The final modular assembly will be clad with a cassette blanket facade, which will give the building an attractive visual design. Office spaces with social facilities are equipped with equipment and design for high user comfort.

Continental's long-term lease

Place of construction: Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2016, 2017 Place of construction: Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2016, 2017

Administrative complex consisting of 115 modules with an admitted trapeze shell in the RAL design.

Petrol station background

Place of construction: Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2020 Place of construction: Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2020

The DUO pumping station in Kladno has acquired a background with a built-up area of 27m2.

Extension of the modular background to the production hall for employees

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2021 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2021

The challenge of each project is fire safety solutions, energy savings, optimized costs and maximized space comfort and utility.