{"id":5493,"date":"2021-06-23T10:35:30","date_gmt":"2021-06-23T08:35:30","guid":{"rendered":"https:\/\/warex.cz\/?post_type=reference&#038;p=5493"},"modified":"2021-06-23T10:49:43","modified_gmt":"2021-06-23T08:49:43","slug":"hall-extension","status":"publish","type":"reference","link":"https:\/\/warex.cz\/en\/references\/hall-extension\/","title":{"rendered":"Hall extension"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The addition of one of its existing WAREX halls at the Javornik <\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>plant.this is an extension of a crane-track production hall<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>the floor plan of the extension is 60x24m, the height of the hall from anchorage to ridge is 11.23m<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>steel columns, anchored on pre-cemented anchor screws, attachment screws in the middle divided, crane track 60m long, arms and ligaments zinged METSEC system, screw assembly joints<br><\/li><li>weight OK with crane track 87.010kg, arms and ligaments Zn METSEC 13.037kg. The total weight OK is 100.050 kg<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>construction in class EXC2 and EXC 3, columns welded from higher quality steel S 355 J2<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The structure was manufactured in its own plant, blasted on a continuous jet to the surface of Sa2,5 and subsequently painted in the plant to the required quality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The connection could be made very economically, as the existing hall already had the last frame for future connections and loads statically ready.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Subsequently, after the OK assembly, the sheathing of the hall was carried out. The roof shell is a folded, load-bearing trapeze sheet. The walls are PUR panels.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The construction also includes hole fillers (gates, wall lighting) , including the installation of a 3.5 x 48 metre roof skylight.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"731\" height=\"311\" src=\"https:\/\/warex.cz\/app\/uploads\/2021\/06\/P1050479-1.jpg\" alt=\"\" class=\"wp-image-5487\" srcset=\"https:\/\/warex.cz\/app\/uploads\/2021\/06\/P1050479-1.jpg 731w, https:\/\/warex.cz\/app\/uploads\/2021\/06\/P1050479-1-300x128.jpg 300w\" sizes=\"auto, (max-width: 731px) 100vw, 731px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"923\" height=\"777\" src=\"https:\/\/warex.cz\/app\/uploads\/2021\/06\/s_javornik-3.png\" alt=\"\" class=\"wp-image-5497\" srcset=\"https:\/\/warex.cz\/app\/uploads\/2021\/06\/s_javornik-3.png 923w, https:\/\/warex.cz\/app\/uploads\/2021\/06\/s_javornik-3-300x253.png 300w, https:\/\/warex.cz\/app\/uploads\/2021\/06\/s_javornik-3-768x647.png 768w\" sizes=\"auto, (max-width: 923px) 100vw, 923px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The addition of one of its existing WAREX halls at the Javornik plant.<\/p>\n","protected":false},"featured_media":5487,"template":"","reference_category":[31],"class_list":["post-5493","reference","type-reference","status-publish","has-post-thumbnail","hentry","reference_category-steel-structures"],"acf":[],"_links":{"self":[{"href":"https:\/\/warex.cz\/en\/wp-json\/wp\/v2\/reference\/5493","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/warex.cz\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/warex.cz\/en\/wp-json\/wp\/v2\/types\/reference"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/warex.cz\/en\/wp-json\/wp\/v2\/media\/5487"}],"wp:attachment":[{"href":"https:\/\/warex.cz\/en\/wp-json\/wp\/v2\/media?parent=5493"}],"wp:term":[{"taxonomy":"reference_category","embeddable":true,"href":"https:\/\/warex.cz\/en\/wp-json\/wp\/v2\/reference_category?post=5493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}