The structure was manufactured in its own plant, blasted on a continuous jet to the surface of Sa2,5 and subsequently painted in the plant to the required quality.

The connection could be made very economically, as the existing hall already had the last frame for future connections and loads statically ready.

Subsequently, after the OK assembly, the sheathing of the hall was carried out. The roof shell is a folded, load-bearing trapeze sheet. The walls are PUR panels.

The construction also includes hole fillers (gates, wall lighting) , including the installation of a 3.5 x 48 metre roof skylight.