Realization of facilities to the three-part sports hall, where it is now possible to run club and school sports in Albstadt again. Residential modules are attached to two sides of the hall. A total of 38 containers comprise the assembly. The equipment and storage areas are located on the west side of the new sports hall. Changing rooms, toilets and showers are located on the eastern side. A coloured banner is located on the east side of the assembly.