Continental’s long-term lease

Place of construction: Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2016, 2017

Administrative complex consisting of 115 modules with an admitted trapeze shell in the RAL design.

The object is modified for required fire resistance and energy performance. High standard of utility value of space, indoor and outdoor staircases, changing rooms, conference rooms, sanitary and rest areas.

Precisely tailored to the requirements of the investor.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office building with an external staircase consisting of 9 residential containers.

Primary school extension

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2023 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2023

We have expanded the primary school in Tuchoměřice. The assembly is built of 4 residential modules and two modules of external staircase connecting the existing school building with the new classroom. The extension is fitted with pine panelling. The extension also included a complete repair of the facade of the existing school building.

Background of the Workout Playground

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2023 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2023

We realized the background of the Workout playground on the embankment in Prague, Smíchov, built of 4 residential and sanitary modules. The facilities include changing rooms, showers, toilets including a sales stand.