Office set – Germany

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2020

We started the assembly of the office set, which is solved by 6 pieces of modules with a floor plan of modules in the dimensions of 10x3m and 6x3m.

The final modular assembly will be clad with a cassette blanket facade, which will give the building an attractive visual design. Office spaces with social facilities are equipped with equipment and design for high user comfort.

Background for BMW

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and supplied the living modules for the largest BMW test centre in the world.

Extension of the sports hall facilities

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

Realization of facilities to the three-part sports hall, where it is now possible to run club and school sports in Albstadt again.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office building with an external staircase consisting of 9 residential containers.