Set of two containers

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2019

The set consists of 2 modules and is in a flood area.

The bottom module is, according to customer requirements and described specifications, different from the top module. The customer expects that the lower module will be flooded and the customer’s requirements have an impact on the floor design and the use of PIR panels due to their water non-absorbency. Also the drawers, boilers, and switches are located at a height of 160 cm. Walls and ceiling – finishing surface: Fiberglass wallpaper with final dispersion coating / waterproof. An outdoor staircase leads along the container to the first floor. Multisplit air conditioning.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office building with an external staircase consisting of 9 residential containers.

Primary school extension

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2023 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2023

We have expanded the primary school in Tuchoměřice. The assembly is built of 4 residential modules and two modules of external staircase connecting the existing school building with the new classroom. The extension is fitted with pine panelling. The extension also included a complete repair of the facade of the existing school building.

Background of the Workout Playground

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2023 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2023

We realized the background of the Workout playground on the embankment in Prague, Smíchov, built of 4 residential and sanitary modules. The facilities include changing rooms, showers, toilets including a sales stand.