Background for BMW

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024

We manufactured and supplied the living modules for the largest BMW test centre in the world. The test centre near Sokolov will be used to test new BMW technologies. The Future Mobility Development Center (FMDC) in the Czech Republic covers an area of 600 hectares. Modules supplied by us will serve as facilities for BMW employees and visitors.

Modular school

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and built a primary school in Germany with interior design and equipment tailored to the needs of the investor,

Background for radar assembly

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and built the radar assembly facilities for the US Army. The assembly is built of 8 living containers and a stair tower.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office assembly with a terrace consisting of 9 residential modules with a staircase and a landing. The building includes kitchenettes and toilets with showers.