We manufactured and built the radar assembly facilities for the US Army. The assembly is built of 8 living containers and a stair tower. In the backroom there are offices and a technical room. Now the assembly is being completed with a sanitary container. The walls are made of plasterboard. The heating is solved in the form of direct heating panels. The assembly also includes air conditioning.
Modular school
Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024
We manufactured and built a primary school in Germany with interior design and equipment tailored to the needs of the investor,
Office building
Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024
We realized a two-storey office assembly with a terrace consisting of 9 residential modules with a staircase and a landing. The building includes kitchenettes and toilets with showers.
Office set
Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024
We realized an office set consisting of 6 residential modules in Germany. In recent years, office assemblies made of residential modules have become an increasingly popular choice for companies of all sizes.