Background of the Workout Playground

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2023

We realized the background of the Workout playground on the embankment in Prague, Smíchov, built of 4 residential and sanitary modules. The facilities include changing rooms, showers, toilets including a sales stand.

Modular school

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and built a primary school in Germany with interior design and equipment tailored to the needs of the investor,

Background for radar assembly

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and built the radar assembly facilities for the US Army. The assembly is built of 8 living containers and a stair tower.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office assembly with a terrace consisting of 9 residential modules with a staircase and a landing. The building includes kitchenettes and toilets with showers.