9 modules on an area of approx. 135 m² created the 1st and 2nd above-ground floors of the modular assembly with staircase roofing, attic and countertop roof. The entire module assembly is connected to hot water heating.
Modular school
Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024
We realized the completion of a two-storey primary school in Bohuslavice.
Modular school
Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024
We manufactured and built a primary school in Germany with interior design and equipment tailored to the needs of the investor,
Background for radar assembly
Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024
We manufactured and built the radar assembly facilities for the US Army. The assembly is built of 8 living containers and a stair tower.