Set of two containers

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2019

The set consists of 2 modules and is in a flood area.

The bottom module is, according to customer requirements and described specifications, different from the top module. The customer expects that the lower module will be flooded and the customer’s requirements have an impact on the floor design and the use of PIR panels due to their water non-absorbency. Also the drawers, boilers, and switches are located at a height of 160 cm. Walls and ceiling – finishing surface: Fiberglass wallpaper with final dispersion coating / waterproof. An outdoor staircase leads along the container to the first floor. Multisplit air conditioning.

Office assembly

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2021 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2021

Floor set of 8 office modules with staircase and landing in Germany.

Kindergarten

Place of construction: Switzerland | Type: MODULAR BUILDINGS | Year: 2021 Place of construction: Switzerland
Type: MODULAR BUILDINGS
Year: 2021

Two-storey kindergarten with a separate staircase leading along the building. The kindergarten consists of 16 modules, including hygienic facilities. The building is built exactly to the investor's requirements.

Linderpark Family Centre

Place of construction: | Type: MODULAR BUILDINGS | Year: Place of construction:
Type: MODULAR BUILDINGS
Year:

Delivery of two containers with assembly to the Lindenpark Family Centre. Windows and equipment installed by the customer. Used for various events, from concerts to seminars and workshops.