Office assembly

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2021

Implementation of an office assembly of 90 containers and sanitary accessories for renovation work at the Brunswick Clinic – three floors. The containers meet the EnEv design with an internal staircase, sewage system and office use.

Background for radar assembly

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and built the radar assembly facilities for the US Army. The assembly is built of 8 living containers and a stair tower.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office assembly with a terrace consisting of 9 residential modules with a staircase and a landing. The building includes kitchenettes and toilets with showers.

Office set

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized an office set consisting of 6 residential modules in Germany. In recent years, office assemblies made of residential modules have become an increasingly popular choice for companies of all sizes.