We have expanded the primary school in Tuchoměřice. The assembly is built of 4 residential modules and two modules of external staircase connecting the existing school building with the new classroom. The extension is fitted with pine panelling. The extension also included a complete repair of the facade of the existing school building.
Modular school
Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024
We manufactured and built a primary school in Germany with interior design and equipment tailored to the needs of the investor,
Background for radar assembly
Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024
We manufactured and built the radar assembly facilities for the US Army. The assembly is built of 8 living containers and a stair tower.
Office building
Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024
We realized a two-storey office assembly with a terrace consisting of 9 residential modules with a staircase and a landing. The building includes kitchenettes and toilets with showers.