Set of two containers

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2019

The set consists of 2 modules and is in a flood area.

The bottom module is, according to customer requirements and described specifications, different from the top module. The customer expects that the lower module will be flooded and the customer’s requirements have an impact on the floor design and the use of PIR panels due to their water non-absorbency. Also the drawers, boilers, and switches are located at a height of 160 cm. Walls and ceiling – finishing surface: Fiberglass wallpaper with final dispersion coating / waterproof. An outdoor staircase leads along the container to the first floor. Multisplit air conditioning.

Background for radar assembly

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and built the radar assembly facilities for the US Army. The assembly is built of 8 living containers and a stair tower.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office assembly with a terrace consisting of 9 residential modules with a staircase and a landing. The building includes kitchenettes and toilets with showers.

Office set

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized an office set consisting of 6 residential modules in Germany. In recent years, office assemblies made of residential modules have become an increasingly popular choice for companies of all sizes.