Modular buildings – Police school

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2020

47 modules with a built-up area of ​​approx. 922m², with an adjusted external module height of 3.3m.

Fulfilled specified conditions of assignment in the field of PBŘ, dimensional and interior design of the set, used materials and equipment.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office building with an external staircase consisting of 9 residential containers.

Primary school extension

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2023 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2023

We have expanded the primary school in Tuchoměřice. The assembly is built of 4 residential modules and two modules of external staircase connecting the existing school building with the new classroom. The extension is fitted with pine panelling. The extension also included a complete repair of the facade of the existing school building.

Background of the Workout Playground

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2023 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2023

We realized the background of the Workout playground on the embankment in Prague, Smíchov, built of 4 residential and sanitary modules. The facilities include changing rooms, showers, toilets including a sales stand.