We manufactured and supplied the background for a central wastewater treatment plant in Germany. The background was manufactured exactly according to the project documentation, including an atypical facade. It consists of 3 office and sanitary modules.
Modular school
Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024
We realized the completion of a two-storey primary school in Bohuslavice.
Modular school
Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024
We manufactured and built a primary school in Germany with interior design and equipment tailored to the needs of the investor,
Background for radar assembly
Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024
Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024
We manufactured and built the radar assembly facilities for the US Army. The assembly is built of 8 living containers and a stair tower.