Extension of the modular background to the production hall for employees

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2021

The challenge of each project is fire safety solutions, energy savings, optimized costs and maximized space comfort and utility.

The set of 8 modules represents a day and training room, hygienic facilities for men and women and an office. It was designed and implemented to meet the idea of being installed between two entrance gates and at the same time under the hot water line. This extension also meets the need for the direct access from the production hall to the background, fire, energy and hygiene requirements and at the same time fit in with the appearance of the existing building.

Extension of the sports hall facilities

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

Realization of facilities to the three-part sports hall, where it is now possible to run club and school sports in Albstadt again.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office building with an external staircase consisting of 9 residential containers.

Primary school extension

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2023 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2023

We have expanded the primary school in Tuchoměřice. The assembly is built of 4 residential modules and two modules of external staircase connecting the existing school building with the new classroom. The extension is fitted with pine panelling. The extension also included a complete repair of the facade of the existing school building.