Extension of the modular background to the production hall for employees

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2021

The challenge of each project is fire safety solutions, energy savings, optimized costs and maximized space comfort and utility.

The set of 8 modules represents a day and training room, hygienic facilities for men and women and an office. It was designed and implemented to meet the idea of being installed between two entrance gates and at the same time under the hot water line. This extension also meets the need for the direct access from the production hall to the background, fire, energy and hygiene requirements and at the same time fit in with the appearance of the existing building.

Multi-storey hostel

Place of construction: | Type: MODULAR BUILDINGS | Year: Place of construction:
Type: MODULAR BUILDINGS
Year:

We realized a three-storey modular hostel in Germany. 

Modular school

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024

We realized the completion of a two-storey primary school in Bohuslavice.

Modular school

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and built a primary school in Germany with interior design and equipment tailored to the needs of the investor,