Extension of the modular background to the production hall for employees

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2021

The challenge of each project is fire safety solutions, energy savings, optimized costs and maximized space comfort and utility.

The set of 8 modules represents a day and training room, hygienic facilities for men and women and an office. It was designed and implemented to meet the idea of being installed between two entrance gates and at the same time under the hot water line. This extension also meets the need for the direct access from the production hall to the background, fire, energy and hygiene requirements and at the same time fit in with the appearance of the existing building.

Office facilities

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024

We are building office facilities for a company operating in the field of water and waste management. Modular building consisting of 36 containers including sanitary modules and showers.

Background for BMW

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and supplied the living modules for the largest BMW test centre in the world.

Extension of the sports hall facilities

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

Realization of facilities to the three-part sports hall, where it is now possible to run club and school sports in Albstadt again.