Extension of the modular background to the production hall for employees

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2021

The challenge of each project is fire safety solutions, energy savings, optimized costs and maximized space comfort and utility.

The set of 8 modules represents a day and training room, hygienic facilities for men and women and an office. It was designed and implemented to meet the idea of being installed between two entrance gates and at the same time under the hot water line. This extension also meets the need for the direct access from the production hall to the background, fire, energy and hygiene requirements and at the same time fit in with the appearance of the existing building.

School

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2020 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2020

Multi-storey assembly of 34 living modules with external staircase. There are 6 classrooms in the building.

Facilities for the rescue service

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2023 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2023

We realized a modular building made of 12 residential containers.

Extension of a living container to a caravan

Place of construction: Austria | Type: MODULAR BUILDINGS | Year: 2023 Place of construction: Austria
Type: MODULAR BUILDINGS
Year: 2023

Attaching a container to your caravan means you’ll have more amenities and conveniences, such as a full kitchen, bathrooms with shower and toilet,