Modular buildings – The primary and nursery school Erlangen

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2020

A set of 64 pieces of modules with a built-up area of ​​576m².

The primary and nursery school, consisting of residential and social modules, covered the capacity need to house all preschool children in Erlangen.

The building met all the required fire and energy solutions, has 2 escape stair towers, is connected to hot water heating, equipment of the set and interior elements tailored to the requirements of the investor.

Modular school

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and built a primary school in Germany with interior design and equipment tailored to the needs of the investor,

Background for radar assembly

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We manufactured and built the radar assembly facilities for the US Army. The assembly is built of 8 living containers and a stair tower.

Office building

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a two-storey office assembly with a terrace consisting of 9 residential modules with a staircase and a landing. The building includes kitchenettes and toilets with showers.