Modular buildings – The primary and nursery school Erlangen

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2020

A set of 64 pieces of modules with a built-up area of ​​576m².

The primary and nursery school, consisting of residential and social modules, covered the capacity need to house all preschool children in Erlangen.

The building met all the required fire and energy solutions, has 2 escape stair towers, is connected to hot water heating, equipment of the set and interior elements tailored to the requirements of the investor.

Background for tennis players made of residential modules

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2025 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2025

We have manufactured and built a tennis facility consisting of 5 residential containers including toilet facilities and showers.

Modular gatehouse

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We have implemented a gatehouse in Germany.  The modular assembly was built from 3 modules including sanitary equipment and kitchenette.

Multi-storey hostel

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2024 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2024

We realized a three-storey modular hostel in Germany.