The challenge of each project is fire safety solutions, energy savings, optimized costs and maximized space comfort and utility.

The set of 8 modules represents a day and training room, hygienic facilities for men and women and an office. It was designed and implemented to meet the idea of being installed between two entrance gates and at the same time under the hot water line. This extension also meets the need for the direct access from the production hall to the background, fire, energy and hygiene requirements and at the same time fit in with the appearance of the existing building.

Office assembly

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2021 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2021

Floor set of 8 office modules with staircase and landing in Germany.

Kindergarten

Place of construction: Switzerland | Type: MODULAR BUILDINGS | Year: 2021 Place of construction: Switzerland
Type: MODULAR BUILDINGS
Year: 2021

Two-storey kindergarten with a separate staircase leading along the building. The kindergarten consists of 16 modules, including hygienic facilities. The building is built exactly to the investor's requirements.

Linderpark Family Centre

Place of construction: | Type: MODULAR BUILDINGS | Year: Place of construction:
Type: MODULAR BUILDINGS
Year:

Delivery of two containers with assembly to the Lindenpark Family Centre. Windows and equipment installed by the customer. Used for various events, from concerts to seminars and workshops.