Extension of the modular background to the production hall for employees

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2021

The challenge of each project is fire safety solutions, energy savings, optimized costs and maximized space comfort and utility.

The set of 8 modules represents a day and training room, hygienic facilities for men and women and an office. It was designed and implemented to meet the idea of being installed between two entrance gates and at the same time under the hot water line. This extension also meets the need for the direct access from the production hall to the background, fire, energy and hygiene requirements and at the same time fit in with the appearance of the existing building.

Elementary School

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2022 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2022

We have expanded the capacity of the primary school in Prague Uhříněvsi.

Residential set

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2022 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2022

We have realized a TRIO residential assembly with a pitched roof including sanitary facilities.

Administrative assembly

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2021 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2021

We manufactured and delivered an office set to Germany. The processing of the residential modules was carried out according to the exact instructions of the investor. It is 4 residential containers connected as open space.