Extension of the modular background to the production hall for employees

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2021

The challenge of each project is fire safety solutions, energy savings, optimized costs and maximized space comfort and utility.

The set of 8 modules represents a day and training room, hygienic facilities for men and women and an office. It was designed and implemented to meet the idea of being installed between two entrance gates and at the same time under the hot water line. This extension also meets the need for the direct access from the production hall to the background, fire, energy and hygiene requirements and at the same time fit in with the appearance of the existing building.

Facilities for bicycle repair staff

Place of construction: Czechia | Type: MODULAR BUILDINGS | Year: 2021 Place of construction: Czechia
Type: MODULAR BUILDINGS
Year: 2021

We have provided elegant and purposeful facilities for staff to 11 places for the network of bicycle repairs throughout the Czech Republic.

Hotel rooms - Zülpich

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2020 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2020

Hotel rooms with a comfortable and imaginative, minimalist, interior design. The building is located in the natural environment of Zülpich.

Office set – Germany

Place of construction: Germany | Type: MODULAR BUILDINGS | Year: 2020 Place of construction: Germany
Type: MODULAR BUILDINGS
Year: 2020

We started the assembly of the office set, which is solved by 6 pieces of modules with a floor plan of modules in the dimensions of 10x3m and 6x3m.